zurück zu:

Home
Industrieabwasser
Kommunales Abwasser
Betreuungsverträge
International Projects: Jordan
PIK GmbH

TOP Jordan:
Treatment Optimization for Wastewater Plants in Jordan

Part-financed by DEG and Public Funds from German Federal Ministry for Economic Cooperation and Development

Key objectives:

-  Evaluation of the status quo for 3 WWTPs
  
• Design and construction,
  
• actual loads,
  
• operating parameter,
  
• starting points for improvement.

-  State of the art report on using treated wastewater as resource for irrigation

-  Audit Workshop „WWTP operation“ in close cooperation with
   Water Authority of Jordan to improve treatment performance

-  Determination and implementation of measures for process optimization to
   reach theoretical maximum performance

-  Action plan to fulfil specific irrigation requirements

-  Process oriented operation manual
   (plant operation, working process, self monitoring)

-  Concluding conference in Amman, End of 2011

3 Participating Waste Water Treatment Plants:

WWTP Ain Al Basha (Al Baqa) / Jordan,
actual load 140.000 PE
B60

WWTP Jerash / Jordan,
actual load 90.000 PE
B60

WWTP Irbid / Jordan,
actual load 135.000 PE
B60