|
|
 |
 |
|
Key objectives:
|
 |
 |
|
- Evaluation of the status quo for 3 WWTPs • Design and construction, • actual loads, • operating parameter, •
starting points for improvement.
|
 |
 |
|
- State of the art report on using treated wastewater as resource for irrigation
|
 |
 |
|
- Audit Workshop „WWTP operation“ in close cooperation with Water Authority of Jordan to improve treatment performance
|
 |
 |
|
- Determination and implementation of measures for process optimization to reach theoretical maximum performance
|
 |
 |
|
- Action plan to fulfil specific irrigation requirements
|
 |
 |
|
- Process oriented operation manual (plant operation, working process, self monitoring)
|
 |
 |
|
- Concluding conference in Amman, End of 2011
|
 |
 |
|
3 Participating Waste Water Treatment Plants:
|
|